 |
 |
 |
Our team will spend more time in advance of the job start to
understand the idiosyncrasies of the project and the build so
that no time is wasted after the work has begun. |
|
|
|
 |
 |
|
Our designs are created with the hotel operation in mind. We
understand that the long term maintenance is what our clients
are responsible for so we choose goods that are designed for
commercial wear. |
 |
|
|
|
 |
 |
 |
Budgeting is what drives the job so we take care to work with
your team to develop a preliminary budget based on the desired
scope or PIP instructions to insure our clients understand the
cost range prior to developing any design work. |
|
|
|
 |
 |
| In some cases, if our client has accounts established with primary vendors, we can work as a purchasing agent to expedite the process of getting the materials to the jobsite. Mainly, we will provide you with a lump sum price which will not change unless you change the scope. |
 |
|
|
|
 |
 |
|
We have dedicated staff that manages the order development process and logistics right to the jobsite to insure we have materials on time and not overly load the job with goods which drives up warehousing costs. |
|
|
|
 |
 |
| We frequently establish a local warehouse to receive goods off site so that the project doesn't get overly congested with storage trailers and salvage can be removed off site as soon as it comes out of the building. |
 |
|
|
|
 |
 |
 |
A big part of what we do is to coordinate the FF&E to match the guest room layout plans and then deliver to the job by floor and install the goods. |
|
|
|
|
|